BtMData — Energía y compliance para centros de datos
    Cambois, Northumberland

    QTS Cambois Campus

    Verified profile of QTS Cambois Campus (QTS (Blackstone)), a data centre in Cambois, Northumberland, United Kingdom: mapped location, grid context and…

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Cambois, Northumberland, United Kingdom
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    QTS (Blackstone)

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~4.6 ms RTT → Dublin (363 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerQTS (Blackstone)
    Published capacity—
    CityCambois, Northumberland
    CountryUnited Kingdom
    Address—
    Coordinates55.07000, -1.52000
    Year—
    StatusAnnounced
    Phase~£10bn campus on the former Blyth coal power station
    Expected year—
    IT load—
    Capacity note—
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed11/09/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for QTS Cambois Campus

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass